The D.A.T.E.D.
Action Group
West Park
Darrington
Pontefract
West Yorkshire

Telephone:
01977 620382

New DATED logo

D.A.T.E.D. Photo Gallery

Do+we+want+to+see+this

The pictures shown above are normal scenes where the construction of wind farms are taking place. Are we sure that we want to see these scenes around Darrington & Wentbridge? If the answer is NO!, then we need to fight against Banks Developments Application to erect the wind monitoring mast (which determins the type of turbine required). The main Application for planning permission to erect the turbines will follow. We must fight NOW

viewpoint+1

viewpoint+2

viewpoint+3

viewpoint+4

viewpoint+5

Keep checking this page for new photographs, we will be adding new ones soon.

Many of the photographs that are displayed on this page are to give you an insight into the various stages of construction. What you would normally see around the construction area.

These things are massive, and many people just can’t imagine the colosal size. Below, we have added some photographs which were taken during the construction of a wind farm at the other side of Rochdale.

A 40m long turbine blade

Connecting the blade hub

Connecting the blade to the hub

Delivering turbine sections

Ready to lift

working on Hub 60m up No2

[Home] [Contacts] [Latest News] [Campaign] [Tech Info] [The Gallery] [Feed Back] [Letters] [News Letters] [Useful Links]

© Copyright: D.A.T.E.D. Action Group 2007 - 2008 All rights reserved

Web Site Design & Graphics By: JayBee Systems of Pontefract Tel: 01977 629575 Fax: 01977 771189